Skip to content
androtrack.com
androtrack.com
  • Home
  • Contact
  • Download AndroTrack
  • Download Hi-BIT player
androtrack.com
androtrack app
15.10.202516.03.2026

AndroTrack 3.3

Your Ultimate Men’s Health & Performance Hub Version 3.3 Out Now

The comprehensive analytical powerhouse integrating hormone monitoring with professional-grade strength training analytics.

🏋️‍♂️ All-in-One Training Suite: From Plan to Progress

The 3.3 update transforms AndroTrack into a tool that bridges the gap between the lab and the squat rack. Stop juggling multiple apps—AndroTrack now features a built-in training diary designed for those who take their lifting seriously:

  • Workout Plan: Create and customize your weekly routines (Monday–Sunday) with a clean, intuitive interface.
  • Live Workout Tracking: Log every exercise, set, and rep in real-time (Bench Press, Squats, Rows, etc.).
  • Volume & Load Analytics: Automatic calculations of total workload (Weight × Reps × Sets) with visual progress charts.

⚖️ Philosophy: «More isn’t better» – Find Your Optimal Level

This is the core of our update. We’ve added a dedicated analytical module to help you move beyond the «more is always better» mindset and find your individual «Sweet Spot».

For Athletes:

Higher dosages or extreme weights don’t always mean better results. Identify where your progress peaks without compromising long-term health.

For TRT/HRT Users:

Coordinate hormone trends with gym performance to find the exact dosage and intensity that makes you feel 100% while staying in the safe zone.

AndroTrack Workout Tracker Interface
AndroTrack Exercise Log and Volume Analytics
AndroTrack Progress Charts and Trends
AndroTrack Testosterone and Hormone Logs

Integrated Health Monitoring

AndroTrack is specifically designed for men who want full control over key body indicators. It allows you to store, organize, and analyze test results directly related to male health, including:

  • Hormone levels
  • Thyroid function
  • Cardiovascular status
  • Lipid profiles
  • Vitamin/Mineral levels
  • Biochemical markers
AndroTrack Comprehensive Health Dashboard

Testosterone Dosage Analysis Feature

AndroTrack helps maintain safe control over testosterone therapy by combining test storage, hormone trend forecasting, and visual charts. Forget separate files—everything is at your fingertips.

Key Tracking Metrics:

  • Blood testosterone level & Hematocrit
  • Current medication dosage
  • Administration frequency

Based on these data, the app builds charts and automatically extrapolates future values, predicting how indicators will change based on your current protocol.

Testosterone Monitoring and Forecasting

Support for Various Testosterone Forms

The app considers a wide range of medications, making it useful for both medical HRT and sports purposes:

  • Sustanon and testosterone mixes
  • Various testosterone esters and derivatives
  • Other hormone-based medications

For bodybuilders and athletes, AndroTrack becomes a true assistant, allowing you to monitor hormone trends and hematocrit in clear charts to adjust dosages timely and maintain training efficiency.

💎 No Subscriptions. Pay Once!

We believe your health data should be yours forever without monthly fees. AndroTrack combines personal medical diary functions with powerful analytical tools in a single one-time purchase.

✅ One-Time Purchase
Full access forever
✅ Zero Data Collection
100% On-device storage
✅ Privacy First
Face ID / Touch ID support

«AndroTrack isn’t just about storing numbers. It’s about understanding your body and progressing with purpose.»

Be a man. At every age!

Privacy Policy

Last updated: August 23, 2025 | Support: support@androtrack.com


1. Data Collection: We are a zero-data-collection app. We do not collect, store, or transmit any personally identifiable information (PII). All data (lab results, dosages, injection dates, workouts) is stored exclusively on your device.

2. Data Storage & Security: Your data is subject to the security of your device. We recommend using Face ID, Touch ID, or a passcode. We do not have access to your backups (iCloud/Google Cloud).

3. Important Health Disclaimer: AndroTrack is for informational purposes only. It is not a medical device or a substitute for professional medical advice. Always consult with a qualified healthcare provider regarding your test results or treatment decisions.

Androtrack

Навигация по записям

Next post
  • Androtrack
  • Collect Habits
  • Hi-Bit: hi-res-music-player
  • Lady Assist
  • Anabolic steroids
  • Testosteron
  • Testosterone Replacement Therapy
  • тестостерон
©2026 androtrack.com | WordPress Theme by SuperbThemes